LNG Production Facility Project

Delivered extensive translation services for the onshore power plant documentation, including design specifications, equipment and material supply documentation, shipyard construction materials, and Trains 1 and 2 modules commissioning documentation for contractor. Project encompassed basis of design, technical drawings, process/utility system calculations and sizing, specifications and requirements. Successfully translated over 3.7 million words of critical technical documentation.

Client: Major LNG producer

Year: 2024 - 2025

Industry: Oil & Gas